500C Cylindrical Electric Heating Mold Circular Ring Pressing Die for Lab Hydraulic Hot Press-MG-PCH-G

500C Cylindrical Electric Heating Mold Circular Ring Pressing Die for Lab Hydraulic Hot Press-MG-PCH-G

MG-PCH-G
₩2,169,592
제품 정보로 건너뛰기
500C Cylindrical Electric Heating Mold Circular Ring Pressing Die for Lab Hydraulic Hot Press-MG-PCH-G
1/6

500C Cylindrical Electric Heating Mold Circular Ring Pressing Die for Lab Hydraulic Hot Press-MG-PCH-G

₩2,169,592
model number

SPECIFICATIONS

Cavity depth: 45mm(N)

Die heating: 0.0C-500.0°C

Die material: Alloy tool steel : Cr12MoV

Dimensions: 78X138mm,90X138mm (LXH)

Indenter hardness: HRC60-HRC62

Power supply: 220V/500W

Product name: 500C Cylindrical electric heating mold

Sample size: 10,13,15,20,30,40mm(M)

Weight: 2.7Kg

brand name: MGSI

capacity: 10,13,15,20,30,40mm(M)

customized support: OEM

material: Alloy tool steel : Cr12MoV

place of origin: Henan, China

size: 78X138mm,90X138mm (LXH)

warranty: 1 Year

500C Cylindrical electric heating mold Circular ring pressing die for forming ring samples-MG-PCH-G

Product name

500C Cylindrical electric heating mold

Product model

MG-PCH-G

Product Description

 dies-1.jpgdies-4.jpgdies-5.jpgdies-8.jpg

Our Services

1. Factory prices with the best quality.

2. One year free-of-charge maintenance for all the equipment

3. Customized service for special demand

4. Fast and flexible delivery, by sea, by air, by express

5. Quick response within 24 hours

 

How to order

1. If you are interested in our products, please tell us the model number and quantity.

2. We will make a proforma invoice for your order.

3. We will deliver the product ASAP on receipt of the payment

 

Guarantee

1. Guarantee for one year after shipment.

 

Payment

1.Telegraphic transfer

2.Western Union

3.Secure Payment through Alibaba

4.L/C

Packaging & Shipping

PACKAGE:

     1 Standard exported package: Internal anticollision protection, external export wooden box packaging.

     2 Shipping by express, by air, by sea according to customers' requirements to find the most suitable way.

     3 Responsible for the damage during the shipping process, will change the damage part for you for free.

 

DELIVERY TIME:15-20 days after confirming order,detail delivery date should be decided according to production season and order quantity.

 

.jpg 

Contact us

Gavin 

 

You may also like